UPRR Closure Structure Project

Odin performed a temporary closure structure as part of the Feather River West Levee improvements. The project consisted of the construction of 83 LF of retaining wall, two 24″ diameter piers, subsurface cutoff plates, and a removable food wall. The project was constructed under and around an active railroad track with no impact to railroad operations.

Project Details

Client
Sutter Butte Flood Control Agency
Location
Yuba City, California
Start Date
June 2019
End Date
ongoing
Service
Dam and Levee Repair
Performed As
Prime

Project Highlights

  • Active railroad
  • 83 LF of retaining wall
  • Two 24┬┤diameter piers