UPRR Closure Structure Project
Odin performed a temporary closure structure as part of the Feather River West Levee improvements. The project consisted of the construction of 83 LF of retaining wall, two 24″ diameter piers, subsurface cutoff plates, and a removable food wall. The project was constructed under and around an active railroad track with no impact to railroad operations.
Project Details
- Client
- Sutter Butte Flood Control Agency
- Location
- Yuba City, California
- Start Date
- June 2019
- End Date
- ongoing
- Service
- Dam and Levee Repair
- Performed As
- Prime

Project Highlights
- Active railroad
- 83 LF of retaining wall
- Two 24´diameter piers