Sunset Weir Emergency Rehabilitation

 Odin mobilized on an emergency basis to repair a breach at the Sunset Weir rip rap diversion dam. Within 48 hours, the Odin team mobilized equipment and manpower, removed vegetation, and developed access roads to the weir. Our team worked around the clock to place 500-pound to 5-ton rip rap within the breach to reestablish the final grades of the weir. 

Project Details

Client
Sutter Extension Water District
Location
Butte County, California
Start Date
September 2019
End Date
September 2019
Service
Comprehensive Post Disaster Emergency Response, Stream restoration
Performed As
Prime

Project Highlights

  • Mobilized with 48 hours
  • Placed 500-lb to 50-ton rip rap