Big Win: PL 84-99 Feather River Levee Repairs

November 6, 2019

Odin was awarded the USACE’s Feather River Levee Repair project in Sutter County, CA. The PL84-99 Feather River Levee Repairs is in Sutter County, CA along the right bank of the Feather River. The project consists of removing the existing concrete culver, constructing a 515,000 SF soil-bentonite cutoff wall to depths up to 65 feet, and installing two welded steel pipes over the completed cutoff wall.